Drilling Activity Deleware Basin, 2015
- July: COG/MTP Reeves County Angler 301H horizontal well completed in the Wolfbone with a 30-day IP rate of 1,330 BOPD.
- October: COG/MTP Reeves County Angler 303H horizontal well completed in the Wolfbone with a 30-day IP rate of 1,188 BOPD.
- October: MTP completes Affirmed 48-1HA targeting the Upper Wolfcamp with a 15,032-ft horizontal and tested at 947 BOPD and 1.9 Mcf/d (1,260 BOEPD, 75% oil).
- Dec: MTP completes Man O’ War 8-1HA targeting the Upper Wolfcamp with a 15,100-ft horizontal and tested 830 BOPD and 2.0 Mcf/d (1,159 BOEPD 72% oil).